Contact Service request

Description

The threaded end allows you to manually pull in the pipes directly behind the hose after the jacking. After the completion of the jacking, we disconnect the mole in the start trench from the supply hose, to which we tighten the cutting end with the threaded prepared for pulling in the PE / PVC pipe. Then, by pulling the hose in the starter trench, we pull the installed PE / PVC pipe in the previously made hole.

END FITTINGS:1/2” male threads

Detailed information available upon request.

  • Additional information
Weight0,3 kg
Dimensions15 × 10 × 10 cm